#rtslink #新柔快铁 #马来西亚房地产
RTS(Rapid Transit System Link),新柔快铁自2019年动工至今究竟完成了多少%的工程?基于好奇心的驱使下,Zack和Winnie特地制作了这一支影片让大家看看在2023年的6月里,这项备受瞩目的大工程到底完成了多少?影片里也会跟大家分享RTS完成后将会带来的经济效应,希望大家能够从中更了解一点关于RTS的相关知识。
RTS (Rapid Transit System Link), how many percent of the project has been completed since the RTS started in 2019? Driven by curiosity, Zack and Winnie specially made this video to let everyone see how much this high-profile project has been completed in June of 2023. The video will also share with you the economic effects that will be brought about by the completion of the RTS. I hope that everyone can learn more about RTS from it.
=======================
Looking for property in Johor Bahru or Kuala Lumpur:
MRT Corp Official Website:
Woodlands North Station-Preview:
买之前要考虑每天4小时过关
以前可以从丹戎巴葛火车站直接到新山,为何不改从丹戎巴葛火车头,荷兰路站,武吉知马油池站 ,(wood land) 克兰芝站对面就是克兰芝地铁站,坐地铁的过了天桥到(移民厅检查站)新加坡关卡,过关卡搭轻快铁直接到新山,马来西亚移民厅关卡,不用浪费这么多钱的工程和时间,(单轨改成双轨的路程)
Singapore side the support for the bridge in the sea is more progress, there is no need to make the platform for construction vehicles as we are using barges.
1,谢谢Zack and Winnie的分享。
新加坡是需要人肉电池。
请不要把你自己用人才这两个字来形容自己。
哈哈。可笑。。。
我创业两年,就上轨道。
被动收入了。
你还在油管乞讨。
你自己说说吧?
还把老婆孩子拉出来一起乞讨。
你老婆真是选错了。。。
老实的找份工作在新加坡是你最佳的出路。
务实点。
别再搞这些有的没的,然后,要买瑕疵品给小孩了。
可悲,凄凉不?
你老婆选错了。时间证明你还是话多过能力的。